Sitesearch

Solutions overview

Solutions for Production and Project Planning

Solutions for Production and Project Planning

PLANWISE can be used for production planning and scheduling, equipment scheduling, and project planning and scheduling. These planning and scheduling problems have a lot of aspects in common, but also have their specific characteristics. PLANWISE can be easily configured to meet the specific characteristics. ORTEC provides standard configurations of PLANWISE for e.g. production scheduling, equipment scheduling and project scheduling.

With Production and Project Planning solutions from ORTEC you can handle the following challenges: 

  • Schedule machines, equipment and tools
  • Schedule of human resources like operators, equipment drivers, or other personnel
  • Optimize the utilization of your scarse resources
  • Deal with complex product and project structures
  • Control workload
  • Meet precedence relations between operations
  • Control calendars and unavailability of resources
  • Deal with competences and capabilities
  • Synchronize various processes
  • Optimize utilization
  • Deal with alternative routings
  • Control material availability and material usage
  • Minimize (sequence dependant) set-up times and change-over times
  • Produce just-in-time
  • Reduce stock levels

Solution

ORTEC PLANWISE is available for:

  • production scheduling in discrete and semi-process manufacturing
  • production scheduling in Engineer-to-Order, Make-to-Order, Assemble-to-Order, Make-to-Stock, and Assemble-to-stock environments
  • equipment scheduling
  • department scheduling
  • project scheduling

For more information see Cases and Brochures for this industry.

Find out more information about Production and Project Planning